Houghton-Hancock Bridge Limits Opening
The lift bridge in Houghton-Hancock (harbor report S-200) will limit opening hours this summer because of construction on the approach roads. Details are in the harbor report...
The lift bridge in Houghton-Hancock (harbor report S-200) will limit opening hours this summer because of construction on the approach roads. Details are in the harbor report...